Lübbering drill integration: guided drilling with digital work instructions

Aircraft wing rib drill jigs with projected drilling guidance in Spirit AeroSystems’ Project LEAD. Photo: Spirit AeroSystems.

The right drill program, one enabled cycle at a time, and a recorded result for every hole. The Ansomat Lübbering Sidecar connects L.ADU drilling units to digital work instructions, bringing program selection, operator guidance and drilling traceability into one workflow.

It builds on the smartbox integration developed with Lübbering for Spirit AeroSystems’ Project LEAD. That earlier integration was used on physical drilling units; the new Sidecar release has been tested with simulation and a test smartbox and still requires validation on a physical drill.

From Spirit AeroSystems to a reusable drill integration

In Spirit AeroSystems’ Project LEAD, Ansomat supported aircraft wing assembly across a 14-metre workspace. Projected drilling positions, cameras and tool identification helped connect each operator action to the assembly process. Ansomat and Lübbering worked together on the TCP/IP interface that allowed the work instruction to communicate with the drill’s smartbox.

The new Sidecar packages that drill connection as a dedicated integration running beside the Ansomat API on the station PC. It connects to a standard Sidecar step without requiring changes to the Ansomat core.

Header photo: Spirit AeroSystems, Project LEAD. It shows drill jigs in the earlier Project LEAD setup, not a field test of the new Sidecar.

How guided drilling works

A drilling instruction needs to do more than tell the operator how many holes to make. It should connect the selected program, each cycle and the recorded outcome to the same step.

  1. Check the drill and program. The Sidecar reads the smartbox status, selects one of its ten program slots and can verify the expected program number and revision before the first hole.
  2. Enable one cycle. Ansomat enables the drill for the current hole. The operator normally starts the drill using its usual controls. The smartbox clears the enable signal at the end of the cycle.
  3. Capture the outcome. Ansomat records the result, any reported error and the cycle and tool-life counters against that hole.
  4. Apply the configured next step. A successful cycle advances to the next hole. A failed cycle follows the configured retry or NOK route, keeping the attempts in the record.

The drilling sequence and configurable retry route. The diagram uses English interface terminology.

By default, the drill is disabled outside the drilling step. Remote start is optional and must be allowed in both the Sidecar and the smartbox; operator-initiated drilling remains the default.

A clear instruction at each hole

The operator view shows the current hole, progress through the sequence and the last cycle result. Instructions can include the drill-jig location and the action to perform. If a cycle fails, the configured retry can return to the same hole rather than advancing silently.

Simulated drill example: hole 3 of 5 is enabled. This is a demonstration screen, not a production drilling result.

Drill-cycle control and position control are separate. The Sidecar handles the program, cycle and result. Checking that the tool is at the correct physical location requires an additional position-control solution, such as cameras or a socket tray. These controls can be combined with augmented reality operator guidance in the same work instruction.

Drilling traceability without copying results by hand

The step record brings together the operator and time, drill and smartbox identification, selected program, per-hole outcome, errors and counters. Retry attempts remain visible, helping teams review what happened at an individual hole.

Optional cycle-data collection adds available torque, speed, depth and timing data from the smartbox. The dataset is matched to the cycle counter and retained locally as an XLSX file for further analysis. The available measurements and units depend on the smartbox data; an OK cycle report is not a substitute for the required inspection of the finished hole.

Compatibility and validation before deployment

The integration targets Lübbering L.ADU advanced drilling units with a 255/256 smartbox and TCP/IP interface V9 or later. Each smartbox needs a reachable network connection and its own Sidecar instance.

The new release has been tested with a simulated drill, a test smartbox and Lübbering sample cycle data, including communication interruptions and error handling. It has not yet been run on a physical drill. Before production use, validate the actual drill, program revisions, enable/disable behaviour, retry rules and recorded data in the intended process.

Connect drilling to your work instructions

If you use Lübbering equipment, a useful starting point is one representative drilling step: identify the smartbox version, required program checks, number of holes and traceability requirements. Ansomat can then help assess the integration and the validation needed for your station.

Explore Ansomat digital work instructions or see how connected tools were combined in the Spirit AeroSystems case study.